Architects and Engineers, the NSCS is pleased to present our Facility Design Guidelines, which have been completely revised and updated! Please refer to these NSCS Facility Design Guidelines when working on State College proposals, planning efforts, and construction projects.
Art.2: CAMPUS PLANNING & MASTER PLANNING GUIDELINES
Art.3: APPLICABLE CODES AND STANDARDS
Art.4: STANDARD CONTRACT FORMS
Art.5: PROJECT DESIGN PROCESS REQUIREMENTS
Art.6: PROCEDURES FOR ADVERTISEMENT, BIDDING AND PROCUREMENT
Art.7: GENERAL CONDITIONS, INSURANCE AND BONDING REQUIREMENTS
SPECIFICATION SECTION I - GENERAL REQUIREMENTS
DIVISION 1 - GENERAL REQUIREMENTS
SPECIFICATION SECTION II - TECHNICAL GUIDELINES
DIVISION 2 - EXISTING CONDITIONS
DIVISION 6 - WOOD, PLASTICS AND COMPOSITES
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
DIVISION 14 - CONVEYING SYSTEMS
FACILITIES SERVICES SUBGROUP
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING (HVAC)
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 31 - EARTHWORK - Not Used
DIVISION 32 - EXTERIOR IMPROVEMENTS
EXHIBITS
Ex.1- Sample AIA Form B101-2017 (A/E Consultant Contract)
Ex.2- Sample AIA Form A101-2017 (Construction Contract)
Ex.3- Sample AIA Form A133-2019 (Constr. Manager at Risk–CMR Contract)
Ex.4- NSCS CMR Contingency vs. Scope Matrix
Ex.5- NSCS Contract for Services (Long Form)
Ex.C- Chadron State College Additional Guidelines